SR 167 Puyallup River Bridge

Hazardous materials abatement, blast containment, dangerous waste compliance and steel dismantling on a historic steel truss bridge for WSDOT’s SR 167 Completion Project.

OWNER
WSDOT, SR 167 Completion Project
PRIME CONTRACTOR
Atkinson Construction
LOCATION
Puyallup River, Pierce County, WA
TIMELINE
2025 to 2026

Taking Down a Historic Truss

The old steel truss bridge over the Puyallup River had to come down to make way for the SR 167 Completion Project. Its lead based coatings made it one of the most complex hazardous materials jobs in the region. Working for Atkinson Construction, Fresh Family built and maintained containment around the truss, managed the abrasive blast media and paint waste, and supported the cutting and dismantling of the steel.

Once abatement was complete, the truss sections were loaded onto self propelled transporters and moved off site. Every drum, load and manifest was tracked. Waste was profiled and designated under Washington State dangerous waste rules, coordinated with the Tacoma-Pierce County Health Department, and shipped to permitted disposal facilities.

Fresh Family worker on a lift at the Puyallup River Bridge truss

Project Photos

Fresh Family crew at the Puyallup River Bridge truss before removal
Crew at the truss before removal
Lifts and crew dismantling the Puyallup River Bridge steel truss
Dismantling the steel truss
Dismantled bridge steel members staged on containment plastic
Steel members staged on containment
Waste drum staged on containment along the SR 167 bridge work area
Waste drums staged for disposal
Puyallup River Bridge truss section loaded on transporters for removal
Truss loaded on transporters for removal
Puyallup River Bridge steel truss during SR-167 dismantling
The truss before removal